Side Navigation

X

PIP ELSGS07

Click here to purchase
This Practice describes the minimum requirements for design, fabrication, testing, and documentation of three-phase, high-resistance grounding systems for use on medium voltage delta or wye systems installed in nonclassified areas.

Product Details

Published:
05/01/2019
Number of Pages:
17
File Size:
1 file , 220 KB

PIP ELSGS07

Click here to purchase
This Practice and the purchaser’s data sheet, PIP ELSGS07D,describe the minimum requirements for design, fabrication, testing, and documentation of 5 kV class, three-phase, high-resistance grounding systems for use on 2.4 kV and 4.16 kV delta or wye systems installed in nonclassified areas.

Product Details

Published:
07/01/2014
Number of Pages:
12
File Size:
1 file , 110 KB

PIP ELSGS07

Click here to purchase
This Practice provides requirements for fabricators of high-resistance grounding systems. This Practice describes the minimum requirements for design, fabrication, testing, and documentation of 5000-volt class, three-phase, high-resistance grounding systems for use on 2400-volt and 4160-volt delta or wye systems installed in nonclassified areas. Systems higher than 5000 volts are outside the scope of this document.

Product Details

Published:
01/01/2005
File Size:
1 file , 55 KB

PIP ELSGS07

Click here to purchase
This Practice provides requirements for fabricators of high-resistance grounding systems. This Practice describes the minimum requirements for design, fabrication, testing, and documentation of 5 kV class, three-phase, high-resistance grounding systems for use on 2.4 kV and 4.16 kV delta or wye systems installed in nonclassified areas. Systems higher than 5 kV are outside the scope of this document.

Product Details

Published:
09/01/2009
Number of Pages:
13
File Size:
1 file , 63 KB

You May Also Like