Side Navigation

X

CGA G-1.12

Click here to purchase
This publication is intended for designers, manufacturers, and operators within the acetylene industry. Its purpose is to give guidance on development of mechanical integrity programs for acetylene generators. The user of this publication should review the model mechanical integrity plan and create a site-specific mechanical integrity plan.

This publication gives guidance on the mechanical integrity (MI) of acetylene generator systems that use calcium carbide added to water, known as wet generation. An MI program is intended to ensure that the generator system components do not fail in a way that causes or enhances a catastrophic release of highly hazardous chemicals. This publication identifies potential failure scenarios and consequences for acetylene generator components. For each failure scenario whose consequence is a loss of containment, the publication identifies an inspection method, a minimum frequency of inspection, and the acceptance criteria for the inspection method.

Product Details

Edition:
2
Published:
03/01/2023
Number of Pages:
18
File Size:
1 file , 440 KB
Note:
This product is unavailable in Russia, Ukraine, Belarus

CGA G-1.12

Click here to purchase

This publication is intended for designers, manufacturers, and operators within the acetylene industry. Its purpose is to give guidance on development of mechanical integrity programs for acetylene generators. The user of this publication should review the model mechanical integrity plan and create a site-specific mechanical integrity plan.

This publication gives guidance on the mechanical integrity (MI) of acetylene generator systems that use calcium carbide added to water, known as wet generation. An MI program is intended to ensure that the generator system components do not fail in a way that causes or enhances a catastrophic release of highly hazardous chemicals. This publication identifies potential failure scenarios and consequences for acetylene generator components. For each failure scenario whose consequence is a loss of containment, the publication identifies an inspection method, a minimum frequency of inspection, and the acceptance criteria for the inspection method.

Product Details

Edition:
1
Published:
07/01/2021
Number of Pages:
18
File Size:
1 file , 440 KB
Note:
This product is unavailable in Belarus, Russia, Ukraine

You May Also Like