
ASTM E1804-16(2023)
1.1 This practice covers an arranged method for providing cost analysis during the design phase of a building project.
Product Details
- Published:
- 05/01/2023
- Number of Pages:
- 4
- File Size:
- 1 file , 260 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus