ISA 77.43.01-2014
Click here to purchase
The scope of this standard is to address the unit/plant demand development subsystem for boilers with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes generation demand, boiler demand development, turbine demand development, throttle/header pressure control, and unit megawatt/steam flow control as applicable.
This standard will address two types of process applications:
- a) a single boiler supplying a single turbine, typical of an electric utility power plant; and
- b) a single boiler or multiple boilers supplying a common distribution header, typical of an industrial power plant.
Specifically excluded from consideration are:
- a) dispatch control;
- b) turbine/generator control (other than turbine demand);
- c) feedwater controls
- d) steam temperature controls (covered separately by ANSI/ISA-77.44.01, Fossil Fuel Power Plant – Steam Temperature Controls);
- e) combustion controls (covered separately by ANSI/ISA-77.41.01, Fossil Fuel Power Plant Boiler Combustion Controls);
- f) steam distribution control systems;
- g) economic loading of boilers; and
- h) fluidized bed boilers.
Purpose
The purpose of this document is to establish the minimum requirements for the functional design specifications of unit/plant demand development for control systems for fossil-fueled power plant boilers.
Product Details
- Published:
- 12/22/2014
- ANSI:
- ANSI Approved
- Number of Pages:
- 32