Technology Award: Chiller Plant Paints Energy Optimization
Click here to purchase
As part of a $1.48 billion project, a vehicle assembly plant underwent a renovation. The new chilled water system for its Energy Center operates at an average system efficiency of 0.42 kW/ton (0.12 kW/kW). It achieves a 45% reduction in annual power consumption and operating costs over baseline conditions.
Product Details
- Published:
- 2022
- Number of Pages:
- 3
- Units of Measure:
- Dual
- File Size:
- 1 file , 1.2 MB
- Product Code(s):
- D-AJ22AUGCP
- Note:
- This product is unavailable in Russia, Belarus