Side Navigation

X

Technology Award: Odor Avoidance Primary IAQ Concern For Lab Design

Click here to purchase
Exact Sciences’ Discovery Campus clinical laboratory building supports high-throughput molecular diagnostics testing, processing millions of human stool samples obtained via its colorectal cancer screening test annually. With such large volumes of odorous materials traveling throughout the facility, optimized operational capacity and IAQ were fundamental design requirements. Through extensive energy modeling and an emphasis on high-performance design, this 24-hour clinical processing and manufacturing facility incorporates an advanced HVAC ventilation and exhaust system.

Product Details

Published:
2023
Number of Pages:
3
Units of Measure:
Dual
File Size:
1 file , 1.3 MB
Product Code(s):
D-AJ22SepTO
Note:
This product is unavailable in Russia, Belarus

You May Also Like